πPUS Busan β πPKG Port Klang
π Based on a published indexπ 100-Corridor Benchmark Rate Calculator
Shows the same data as the dossier and workbook: published-index benchmark values with an error range. Actual rates depend on booking date, carrier and surcharges; use this as a reference.
Global Freight Benchmark Dossier Β· November 2026 edition
100 corridors with error ranges and a 150-company directory. PDF in English and Korean. Order by bank wire with an invoice.
π November 2026 benchmark
As of: 2026-11-06
π Alternatives
What βalternativeβ means on this site
A different option for moving the same cargo to the same region. It does not mean cheaper: even when the benchmark is lower, transshipment, terminal, sailing schedule and inland haulage can change the total cost.
- Alternative origin port: same destination and mode, different origin port
- Alternative destination port: same origin port, another port in the same region
- Alternative mode: ocean and air (only where both corridors are in the dossier)
- Alternative carrier: same type, different alliance (no price ranking)
Alternative origin ports for the same destination
| Corridor | Benchmark | Range | Transit | vs this corridor |
|---|---|---|---|---|
| Shanghai β Singapore | $680 | $340~$1,020 (Β±50%) | 6-8 days | β$1,335 (β66%) |
| Shanghai β Port Klang | $720 | $360~$1,080 (Β±50%) | 7-9 days | β$1,295 (β64%) |
| Ningbo β Jakarta | $880 | $440~$1,320 (Β±50%) | 9-12 days | β$1,135 (β56%) |
Alternative destination ports in the same region
| Corridor | Benchmark | Range | Transit | vs this corridor |
|---|---|---|---|---|
| Busan β Haiphong | $1,495 | $1,121~$1,869 (Β±25%) | 5-7 days | β$520 (β26%) |
| Busan β Ho Chi Minh | $1,678 | $1,258~$2,098 (Β±25%) | 6-8 days | β$337 (β17%) |
| Busan β Manila | $1,835 | $1,376~$2,294 (Β±25%) | 5-7 days | β$180 (β9%) |
| Busan β Singapore | $1,935 | $1,451~$2,419 (Β±25%) | 7-9 days | β$80 (β4%) |
β What to check in the quotation
- Verify which local charges are billed at origin versus destination before comparing quotes.
- Check port congestion advisories before fixing a long-validity rate.
- Confirm the exchange rate and date used for local-currency charges.
The full 100-corridor table, 20ft estimates, port charges and sources are in the dossier and workbook.
Figures are reference benchmarks; confirm actual terms with a written quotation. (Data as of: 2026-11-07)